Manindra de Mel Canberra  AEDT

Manindra de Mel Software engineer & ML researcher

©2019–2026

Corresponding author
PlantCLEF 2026
7th on the official leaderboard

Featured work

(06)
  1. 2026Cog & LeverAutomation & ML
  2. 2026Plan4MeAI travel app
  3. 2026PlantCLEF 2026ML research
  4. 2026chr0me.au3D e-commerce
  5. 2023–Rocket RemitFintech data
  6. 2023Canberra Cloud KitchenOrdering platform
  7. All work

Research

(03)

Fine-Tuning of BioCLIP 2.5 with Taxonomic Heads for Multi-Species Plant Identification

Arjun Raj, Manindra de Mel, Razeen Wasif, William Brake

A PlantCLEF 2026 test quadrat: rock, bare soil and mixed low vegetation inside a sampling frame
  1. Quadrat: one field photo of a sampling frame
  2. Sixteen tiles: the photo is cut into a 4 by 4 grid
  3. Two resolutions: each tile is encoded at 224 and 336 pixels
  4. One species set: predictions are averaged, adjusted and thresholded
BioCLIP 2.5 ViT-H/14
0.418Macro F1
7thLeaderboard
7,806Species
2.65MTraining images

About Manindra de Mel

I’m a software engineer and ML researcher in Canberra. I build apps, train vision models, and run production systems.

Products

Apps taken from sketch to store, with live data, streaming generation, payments and subscriptions.

Models

Fine-tuning and evaluation for vision models that have to work on real field data.

Systems

Payments data pipelines, ordering platforms and analytics, run in production.

Manindra de Mel smiling at night in a black blazer and white shirt

Most projects reach me in one of three shapes. A product that has to go from sketch to App Store. A model that has to hold up on real-world data. A system that has to stay up while the business grows around it. I scope it, build it and run it, usually as the only engineer.

P.S. I love cars!

Kind words

(04)
  1. Rocket Remit
    “Strong technical work on our data pipeline and reporting. Manindra understood the regulatory context quickly, asked the right questions, and produced output we could hand straight to the team. Considered, dependable, and easy to work with.”
  2. Canberra Cloud Kitchen
    “Manindra delivered a clean, reliable ordering platform that fit the way our kitchen actually works. He scoped the brief carefully, kept us in the loop through every iteration, and shipped on time. Order flow has been smooth since launch and the back-of-house team picked it up immediately.”
  3. Co-founder, Plan4Me
    “Manindra has been a great co-founder to work with. I’m glad we’re building Plan4Me together.”
  4. Co-founder, Cog & Lever
    “Manindra has been a great co-founder to work with. I’ve conducted published research with him for years, and I’m glad we’re now working on business automation together.”

Extras

(14)

Documents

(05)
  1. Australian National University certificate: Bachelor of Advanced Computing with Honours, awarded 28 August 2026

    Degree (Hons)2026

  2. A page of figures from the PlantCLEF 2026 paper: training images and test quadrats

    PlantCLEF 20262026

  3. A page of figures from the mesh simplification paper: simplified meshes compared side by side

    Mesh simplification2024

  4. A page from the real-time engine tuning proposal: the project timeline chart

    Engine tuningProposal

  5. First page of Manindra de Mel's résumé

    Résumé2026

Field notes

  • Lessons building an AI travel plannerIn progress
  • Fine-tuning BioCLIP 2.5 for PlantCLEF 2026In progress
  • Next write-upDraft